Straumanis-James Hall Renovation

Missouri University of Science & Technology – St. Louis, Missouri

Project Background

This $4.5 million project included the renovation of a 31,000 square foot, four-level science building.

Project Deliverables

This project included research wet labs, offices, machine shop, hot equipment testing lab and a perchloric lab hood within the chemistry lab area. The HVAC systems included the use of energy recovery, VAV hood exhaust with occupancy and sash position controls, process chilled water loop and separate air handling unit for the administrative offices. These systems were the first conceived to utilize the low temperature campus-wide geothermal system for heating and cooling.

PROJECT DETAILS
Architect Of Record

N/A

Construction Cost

$4,500,000

SQ. FT.

31,000

Market Sector

College & University

Year Completed

2014

LEED

N/A

Our Services
McClure Mechanical services
McClure Electrical services
McClure Plumbing services
McClure Fire Safety services
Principal

Phil Wentz, P.E.

Share